Gateway at Millbrae Station Building Team Implements Innovative Cutting-Edge Design-Build System
October 21, 2021
Together with Prescient Co. and Blach/Cahill JV, Republic Urban Properties is proud to debut its video showcasing this cutting-edge technology and wildly successful building team who is speeding up construction time, substantially lowering project costs, and reducing waste at Gateway at Millbrae Station, the largest transit oriented development West of the Mississippi.
Republic Urban Properties, Blach/Cahill and Prescient Co. debut its video sharing the success of the framing system that utilizes design integration, engineering, advanced manufacturing, and rapid assembly to cut overall project costs and reduce project schedules throughout the construction process.
Take a look at the video to learn more about the project and how we are revolutionizing the construction and development industry.
Gateway at Millbrae Station is one of the largest transit-oriented developments in the Western United States. The mixed-use complex, set to be completed in summer 2022, will assist in addressing Bay Area housing needs, as well as bolster office, hospitality and other urban amenities. Poised to create 1,100 new jobs, the project also provides access to sustainable transportation through BART, CalTrain, and SamTrans, with close proximity to San Francisco International Airport. It will include 320 market-rate apartments, 80 Veteran-preferred affordable units, a 164-room Marriott Residence Inn, 150,000 sq. ft. of Class-A office space, 44,000 sq. ft. of ground-floor retail and restaurant space, and establish new public open spaces, plazas, pedestrian/bike paths and dog parks.